An office move is a project, not a one-day job. Planning the sequence is what keeps the team working and the downtime short.

4 to 6 weeks before

  • Fix the move date and tell staff, clients and suppliers.
  • Appoint one person as the move coordinator.
  • Confirm the lease end date for the old office and the possession date for the new one.
  • Inspect the new office: power points, network cabling, lift access, parking and working hours for moving.

2 to 3 weeks before

  • Book your mover and arrange a survey. Share the floor, lift and access details of both offices.
  • Order internet and phone lines for the new office. Installation can take time.
  • Make a floor plan of the new space and number each desk and room.
  • Ask staff to clear out old files and unused items. Moving less costs less.

The week before

  • Give each team colour-coded labels and numbered cartons that match the floor plan.
  • Back up all data. Move servers and network gear last and set them up first.
  • Photograph the server rack and cable layout.
  • Tell the building management about the move day, lift use and any protection needed.

IT and equipment

  • Computers and laptops: remove cables, label each one and pack in padded cartons.
  • Printers: remove ink and toner and secure moving parts.
  • Keep a spare router and a few power strips for day one.

Furniture and documents

  • Dismantle large desks, cubicles and storage units in advance, and keep the screws in labelled bags.
  • Pack confidential files in sealed, labelled boxes and keep the key personnel responsible for them.

Moving day

  • Plan a weekend or holiday move so the team can start on Monday.
  • Keep your coordinator at each end with a copy of the plan.
  • Unpack in priority order: network and phones first, then desks, then storage.

After the move

  • Update your address on Google Business Profile, your website, invoices, GST records, bank and licences.
  • Check all equipment and report any damage the same day.

Our office relocation service is planned around your timeline, including weekend and after-hours moves. Request a survey and we will agree the schedule with you.

Get a free moving quote

Get a Free Quote

See your price instantly. Fixed written quote after a free survey.

Pick-ups within 50 km of Saravanampatti. Drop-off anywhere in India.

Prefer to talk?

Speak to our moving expert now.

+91 85262 97494

Ready when you are.

Tell us where and when. We will take it from there.

Open 24 hours, 7 days a week